Our electrical division handles the live-conductor scope of transmission line projects — from stringing through to testing and commissioning — completing the line after civil foundation and mechanical tower erection work is finished.
Key Capabilities
- Conductor and shield wire stringing/sagging to WAPDA standards
- Installation of assemblies, insulators, and hardware
- Dead-end and jumpering work
- Repair sleeve fixing on damaged conductor and earth wire
- Testing and commissioning of completed line sections
- Over-crossing installation for existing 132kV lines
Representative Work
- Stringing/re-stringing — 132kV D/C New Rohri-Nara-I & New Rohri-Solar Power Plant Line (Locations 13 & 14, GSO Emergency Breakdown)
- Stringing work — 132kV D/C Liberty-Daharki-TPS Guddu Transmission Line (GSC SEPCO)
PEC Specialization: EE04, EE05