Tower Erection, Fabrication & Material Handling

PEC Code: MECH/31594

Tower Erection, Fabrication & Material Handling

We handle the structural/mechanical scope of transmission line construction — transporting and erecting steel tower structures and completing all welding works before the electrical division carries out stringing.

Key Capabilities

  • Transportation of tower material from warehouse to site
  • Erection of D/C steel tower structures (ZM1, ZM1+3, and other WAPDA-standard types)
  • Installation of ACD (Anti-Climbing Devices), sign plates, and barbed wire
  • Electric welding of nuts & bolts on erected towers
  • Mobilization/demobilization of labor crew and T&P (tools & plant) at site

Representative Work

  • Tower erection — 132kV D/C Liberty-Daharki-TPS Guddu Transmission Line (GSC SEPCO)
  • Erection of ZM1 & ZM1+3 type towers — Locations 13 & 14, New Rohri-Nara-I & Solar Power Plant Line
  • Welding of 450 nut/bolt sets on Tower Types ZM1 & ZM1+3

PEC Specialization: BC01, ME07(v)

Service Details
Category Mechanical Engineering
PEC Code MECH/31594
Status Active
Get a Quote

Interested in this service? Contact us for a free consultation and quote.

Contact Us